精品久久精品久久,久久综合免费视频,亚洲综合图色40p,欧美午夜精品久久久久免费视,99久久精品免费看国产情侣,永久久久精品人人做人人爽,久久免费高清视频

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Q & A

Installation method of insulation joint

  • Author:Libo
  • Source:wmiltownv.com
  • Date:2021-06-11
  • Click:0

Installation requirements:

1. The insulation joint shall be installed within 50 meters to avoid a dead opening to be welded.

2. After the insulation flange is connected with the pipeline, do not lift the pipeline within 5 meters of the connector.

3. Pressure test of insulation joint and pipeline instrument.

4. After the insulation joint is connected with the pipeline, the surface temperature of the insulation joint should not be higher than 120℃ during the repair and anti-corrosion work as required.

5. The insulation joint can be installed on the underground straight pipe section.

6. When the insulation joint is installed on the ground, it should be installed on the straight pipe section 20 meters away from the elbow and a support should be provided.

7. Avoid burying the installation in a place where there is perennial water.

8. The central wheelbase of the joint shall be installed on a straight line with the central wheelbase of the pipeline, and the two central wheelbases shall not be greater than 0.2mm when installed.


Online
聯(lián)系方式

熱線電話

18739187123

上班時(shí)間

周一到周五

公司電話

0391-7588881

邹城市| 马边| 屏东市| 北票市| 长兴县| 湘阴县| 阿巴嘎旗| 永年县| 沙洋县| 毕节市| 青浦区| 赤城县| 城市| 德江县| 延安市| 怀宁县| 来凤县| 新宁县| 福安市| 思茅市| 蒲江县| 布尔津县| 克东县| 台南县| 沁水县| 迁安市| 津南区| 奉贤区| 连城县| 洛浦县| 景谷| 南和县| 玛沁县| 乌兰察布市| 祁门县| 玉溪市| 乌什县| 正定县| 黄骅市| 铜川市| 黄浦区|