精品久久精品久久,久久综合免费视频,亚洲综合图色40p,欧美午夜精品久久久久免费视,99久久精品免费看国产情侣,永久久久精品人人做人人爽,久久免费高清视频

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

News

News

Contact

Phone:18739187123

hotline:0391-7588881

E-mail:970512272@qq.com

Address:Wuzhi County, Jiaozuo City, China

Industry News

Discussion on the whole process supervision of test pile

  • Author:Libo
  • Source:wmiltownv.com
  • Date:2021-06-11
  • Click:0

Discussion on the whole process supervision


The risk control system of data life cycle management. Combined with the special equipment management system, to realize the whole process of long distance gas transmission pipeline safety regulation, pipeline enterprises should be formed in the long-term management practice the pipeline integrity management as the core based on the particularity in the long-distance pipeline in special equipment system, in the current in each construction stage of long distance gas transmission pipeline inspection and test results of original records are kept by each test unit is responsible for, Such as steel plate sampling and test analysis results, non-destructive testing negatives of pipe factory, formation process of girth welding process, girth welding non-destructive testing negatives, etc. For each construction unit, the preservation and maintenance of data and materials is a huge investment, while the operation unit in the use of these resources, but faced with the embarrassment of "no way to check up". Therefore, it is an important prerequisite for realizing the whole-process supervision of pipeline enterprises to establish a long-term mechanism for sharing these data resources so as to facilitate the risk control service during operation and operation. (2) Quality supervision in the whole process of pipeline construction, pipeline quality mainly depends on the quality of steel pipe manufacturing and on-site welding and construction quality two major links. The steel pipe manufacturing process basically realizes the whole process supervision of each link of manufacturing. In terms of field construction, with the accumulation of long distance pipeline construction experience and the improvement of technical level, the field construction quality of domestic long distance pipeline has made a qualitative leap, but the pipeline construction process is still the link with the most concentrated pipeline risk. In this regard, supervision should be strengthened in two aspects: first, risk analysis should be carried out for each construction process to determine the content and indicators of supervision. If the contact is used in the link of the dead mouth, the stress index of the strong force group of the mouth should be determined, and measures should be made to control the occurrence of the strong force group. The second is to establish effective quality supervision system, the index of the construction process have traceability, construction quality control indicators have verifiability, especially to take cover engineering process supervision link, should focus on establishing effect validation experiments, such as for directional drilling pipe exists in the process of damage, such as scratch, deformation can increase in the volume of a length to be dragged back, The appearance and mechanical properties of the redundant backhaul pipe joints were analyzed to determine the backhaul quality of the directional drill.


Online
聯(lián)系方式

熱線電話

18739187123

上班時間

周一到周五

公司電話

0391-7588881

晋江市| 榆中县| 察哈| 白沙| 襄汾县| 尼木县| 江安县| 玛多县| 拉萨市| 葫芦岛市| 石景山区| 内乡县| 阿勒泰市| 湘乡市| 林州市| 西贡区| 嘉荫县| 西和县| 扬中市| 当雄县| 通辽市| 齐河县| 油尖旺区| 监利县| 房山区| 通渭县| 深水埗区| 榆林市| 广宁县| 嵊州市| 中牟县| 从化市| 隆回县| 灵山县| 广西| 嘉义市| 逊克县| 远安县| 江孜县| 泌阳县| 连平县|